
Home Additions · Naples, FL
Titan Builder & Renovation designs and builds primary suite expansions, second stories, in-law suites, and lanai enclosures across Naples that look like they were part of the home from day one — matched rooflines, matched fenestration, matched finishes.
20+ Years
Construction experience
Licensed & Insured
CGC1541818 · CCC1337764 · CRC1336002
Homes & Renovations
Naples to Cape Coral
Client-Focused Service
Google · Houzz · Referrals
01 — The Short Answer
A Naples home addition typically takes 3–10 months depending on complexity, foundation type, and finish level. Titan handles design, structural engineering, Collier County permitting, HOA approval, and construction under one contract.
02 — What Matters
Every project is engineered for Southwest Florida — coastal exposure, code, and the standard our clients hold us to.
Matched rooflines, matched siding profiles, matched trim details — additions that look original, not bolted-on.
Foundation, framing, and roof tie-in engineered by licensed professionals, submitted with permit.
Architectural review packages prepared to satisfy the strictest Naples associations.
Existing flooring, trim, paint, and cabinetry sourced to match — no jarring transitions between old and new.
04 — Scope & Timeline
| Addition type | Timeline |
|---|---|
| Lanai enclosure / bonus room (200–350 sq ft) | 3–5 months |
| Primary suite addition (400–600 sq ft) | 4–7 months |
| In-law suite with kitchenette (600–900 sq ft) | 5–8 months |
| Second-story addition (800–1,400 sq ft) | 6–10 months |
Every scope includes design, structural engineering, Collier County permitting, HOA architectural review, foundation or roof tie-in, and interior finish. Site conditions, roof complexity, and finish level drive the spread.
05 — Our Process
Discovery + on-site measurement of existing home
Architectural design tied to existing structure and finishes
Structural engineering and roof / foundation tie-in drawings
Collier County permit and HOA architectural review package
Foundation, framing, roof, exterior, and mechanical rough-in
Interior finish, punch list, and warranty walkthrough
06 — Why Titan
07 — Coverage
Pelican Bay, Port Royal, Aqualane Shores, Park Shore, Old Naples, Pelican Marsh, Grey Oaks, Vineyards, Moorings, Coquina Sands, and Royal Harbor.
08 — Common Questions
Naples additions typically run 3–10 months from design to final inspection depending on foundation type, roof complexity, and permitting. Every addition is quoted from a defined scope after design and structural review.
That's the goal. Our designers match rooflines, fenestration, siding profiles, and interior trim so additions feel native — not bolted on.
Yes. We prepare full ARB packages — drawings, exterior finish samples, and product cut sheets — and manage submittal and revisions until approved by your Naples association.
Design, engineering, and permitting typically run 3–5 months. Construction on a single-story primary suite addition runs 4–7 months. Second-story additions run 6–10 months.
In most cases yes. We define phasing, temporary protection, and access routes during planning so daily life is minimally disrupted.
Naples, FL
Licensed Florida Contractor · CGC1541818 · CCC1337764 · CRC1336002