
Kitchen Remodeling · Sanibel Island, FL
Titan Builder & Renovation designs and builds magazine-quality kitchens across Sanibel Island and surrounding Lee County. From layout reconfiguration and custom cabinetry to natural stone, integrated luxury appliances, and lighting design — one team from tear-out to punch list.
20+ Years
Construction experience
Licensed & Insured
CGC1541818 · CCC1337764 · CRC1336002
Homes & Renovations
Naples to Cape Coral
Client-Focused Service
Google · Houzz · Referrals
01 — The Short Answer
A Sanibel Island kitchen remodel typically takes 8–14 weeks, depending on cabinetry, stone, and appliance selections. Titan handles Lee County permitting, design, materials, and installation as a single fixed scope.
02 — What Matters
Every project is engineered for Southwest Florida — coastal exposure, code, and the standard our clients hold us to.
Site-measured, custom-built cabinetry sized to your Sanibel Island kitchen's exact conditions — no filler panels, no compromises.
Direct-slab selection of quartzite, marble, granite, and quartz — we walk the yard with you, not from a sample chip.
Wolf, Sub-Zero, Miele, Thermador, and Gaggenau planned and roughed-in at design stage — not retrofit after cabinetry.
Layered lighting design, underfloor power for islands, and hidden charging stations planned before cabinets are ordered.
04 — Scope & Timeline
| Scope | Timeline |
|---|---|
| Refresh (cabinets refaced, new stone + appliances) | 5–8 weeks |
| Full custom (new layout + cabinetry) | 10–14 weeks |
| Luxury / open-concept transformation | 12–18 weeks |
Every scope includes Lee County permits, demolition, cabinetry, stone, tile, appliance integration, and final cleanup. Appliance packages coordinated separately when client-supplied.
05 — Our Process
On-site measurement and design intent conversation
Design drawings + finish selections with stone-yard visits
Lee County permits and engineering when required
Demolition and mechanical/electrical/plumbing rough-in
Cabinetry install, stone template, and appliance integration
Punch list, final clean, and warranty walkthrough
06 — Why Titan
07 — Coverage
The Dunes, Gumbo Limbo, Shell Harbor, Sanibel Estates, the East End near the lighthouse, West Gulf Drive beachfront, and the Blind Pass area toward Captiva.
Local permitting notes
Sanibel permits run through the City of Sanibel Building Department, not Lee County. The island is a barrier island with gulf-front VE flood zones and AE zones on the bay side. Post-Ian rebuilds are reviewed against the FEMA 50% substantial-improvement rule, and the Sanibel Plan's strict development, height, and density limits apply to every exterior change.
08 — Common Questions
A Sanibel Island kitchen refresh takes 5–8 weeks, a full custom kitchen 10–14 weeks, and a luxury open-concept transformation 12–18 weeks. Every project is quoted from a defined scope after an on-site walkthrough.
Most Sanibel Island kitchen remodels run 8–14 weeks of active construction. Add 4–8 weeks upfront for design, selections, cabinetry lead-time, and permit issuance.
Yes — for most kitchen-only projects. We set up a temporary kitchen zone, protect adjacent living areas with dust containment, and manage daily cleanup so the rest of the home stays usable.
Often, yes. In Sanibel's VE and AE zones, the City of Sanibel tracks improvement value against the structure's value. We help you scope the kitchen so you know early whether elevation requirements could be triggered.
Yes, with limits. On older ground-level homes, appliances, panels, and outlets must be planned around base flood elevation. We coordinate those details with the City of Sanibel before demolition.

Sanibel Island, FL
Licensed Florida Contractor · CGC1541818 · CCC1337764 · CRC1336002