Kitchen Remodeling · Naples, FL

Kitchen Remodeling in Naples, FL — Custom Cabinetry, Stone & Appliances

Titan Builder & Renovation designs and builds magazine-quality kitchens across Naples and surrounding Collier County. From layout reconfiguration and custom cabinetry to natural stone, integrated luxury appliances, and lighting design — one team from tear-out to punch list.

20+ Years

Construction experience

Licensed & Insured

CGC1541818 · CCC1337764 · CRC1336002

Homes & Renovations

Naples to Cape Coral

Client-Focused Service

Google · Houzz · Referrals

01 — The Short Answer

A Naples kitchen remodel typically takes 8–14 weeks, depending on cabinetry, stone, and appliance selections. Titan handles Collier County permitting, design, materials, and installation as a single fixed scope.

02 — What Matters

What Titan brings to Naples homeowners.

Every project is engineered for Southwest Florida — coastal exposure, code, and the standard our clients hold us to.

Custom cabinetry, not stock

Site-measured, custom-built cabinetry sized to your Naples kitchen's exact conditions — no filler panels, no compromises.

Natural stone specialist network

Direct-slab selection of quartzite, marble, granite, and quartz — we walk the yard with you, not from a sample chip.

Luxury appliance integration

Wolf, Sub-Zero, Miele, Thermador, and Gaggenau planned and roughed-in at design stage — not retrofit after cabinetry.

Lighting + power designed in

Layered lighting design, underfloor power for islands, and hidden charging stations planned before cabinets are ordered.

04 — Scope & Timeline

What a project looks like in Naples.

ScopeTimeline
Refresh (cabinets refaced, new stone + appliances)5–8 weeks
Full custom (new layout + cabinetry)10–14 weeks
Luxury / open-concept transformation12–18 weeks

Every scope includes Collier County permits, demolition, cabinetry, stone, tile, appliance integration, and final cleanup. Appliance packages coordinated separately when client-supplied.

05 — Our Process

How Titan runs the project.

    01

    On-site measurement and design intent conversation

    02

    Design drawings + finish selections with stone-yard visits

    03

    Collier County permits and engineering when required

    04

    Demolition and mechanical/electrical/plumbing rough-in

    05

    Cabinetry install, stone template, and appliance integration

    06

    Punch list, final clean, and warranty walkthrough

06 — Why Titan

Why homeowners choose Titan.

20+ Years of Construction Experience
  • Licensed Florida contractor with 20+ years of construction experience (CGC1541818, CCC1337764, CRC1336002)
  • Portfolio of Naples kitchens across gated and coastal communities
  • In-house crew — same team from demo through appliance install
  • Fixed written scope with line-item pricing — no vague allowances
  • Direct relationships with local cabinet, stone, and appliance suppliers

07 — Coverage

Naples neighborhoods we serve for kitchen remodels

Pelican Bay, Port Royal, Aqualane Shores, Park Shore, Old Naples, Pelican Marsh, Grey Oaks, Vineyards, Moorings, Coquina Sands, and Royal Harbor.

Local permitting notes

Naples work is regulated by the City of Naples Building Department and Collier County outside city limits. Coastal Construction Control Line (CCCL) restrictions apply west of the CCCL, and Old Naples designated historic zones require additional design review. Flood Zones VE and AE dominate the coastal strip.

Client note · Naples, FL

“Titan managed our Port Royal project end-to-end — one team, one number, and finish quality we haven't seen in Naples in years.”

Homeowner, Port Royal·Custom kitchen + primary bath, Naples FL

08 — Common Questions

Questions Naples homeowners ask us.

How long does a kitchen remodel take in Naples, FL?

+

A Naples kitchen refresh takes 5–8 weeks, a full custom kitchen 10–14 weeks, and a luxury open-concept transformation 12–18 weeks. Every project is quoted from a defined scope after an on-site walkthrough.

How long does a Naples kitchen remodel take?

+

Most Naples kitchen remodels run 8–14 weeks of active construction. Add 4–8 weeks upfront for design, selections, cabinetry lead-time, and permit issuance.

Can we live in the home during a Naples kitchen remodel?

+

Yes — for most kitchen-only projects. We set up a temporary kitchen zone, protect adjacent living areas with dust containment, and manage daily cleanup so the rest of the home stays usable.

Can you work inside Pelican Bay and Port Royal HOAs?

+

Yes. We prepare Pelican Bay Foundation and Port Royal Property Owners architectural packages routinely and manage submittal revisions to first-pass approval.

Do you install kitchens in Old Naples cottages with historic review?

+

Yes. Old Naples work triggers City of Naples Design Review. We provide the drawings and material samples the DRB requires and manage the review calendar.

Naples, FL

Start your Naples kitchen remodel

Licensed Florida Contractor · CGC1541818 · CCC1337764 · CRC1336002